Search
Now showing items 1-2 of 2
New characteristics of optimal solutions for the two-machine flowshop problem with unlimited buffers
(
Taylor and Francis Ltd.
, 2019 , Article)
The two-machine flowshop problem with unlimited buffers with the objective of minimising the makespan (F2||Cmax) is addressed. Johnson’s algorithm finds optimal solutions (permutations) to this problem, but are not necessarily ...
An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price
(
Institute of Electrical and Electronics Engineers Inc.
, 2017 , Conference Paper)
This paper investigates the integrated quay crane assignment and scheduling problem (QCASP). The problem requires determining the assignment of quay cranes to vessels and the scheduling of operations to be performed by ...